Case Study

Research

IGBC v3 vs LEED v4.1 Scoring on the Same Indian Project: A Comparative Case Study

This article compares IGBC v3 and LEED v4.1 scoring outcomes on the same hypothetical 10,000 m² Bangalore office project. Identical design strategies (DOAS + ERV + free cooling + 200 kWp PV) yield 78 LEED points (Platinum threshold = 80) and 96 IGBC points (Platinum threshold = 7…

HVAC

Retrofit Case Study: 4-Row AHU to 6-Row + DOAS at Mumbai BPO Floor — 12-Month Measured Outcome

This is the kind of project that does not show up in mepwork.com’s catalogue: a real BPO floor in Mumbai with documented humidity creep complaints, a measured psychrometric mismatch, a brownfield retr

Scroll to Top