AHU

HVAC

Retrofit Case Study: 4-Row AHU to 6-Row + DOAS at Mumbai BPO Floor — 12-Month Measured Outcome

This is the kind of project that does not show up in mepwork.com’s catalogue: a real BPO floor in Mumbai with documented humidity creep complaints, a measured psychrometric mismatch, a brownfield retr

HVAC

From Cooling Load to AHU and Coil Selection: The Psychrometric Bridge

You have a cooling load. Now what? The number on a calc sheet doesn’t size an AHU coil — the psychrometric process between the room and the cooling coil does. This article walks through the bridge: ho

Scroll to Top